Anak Malaysia

Thursday, April 28, 2011

Looking at the Klang Valley Mass Rapid Transit Project

The Sg Buloh to Kajang line is 51 km long and have 9.5km of underground tunnel

It will have 35 stations with 4 interchange stations

The Construction period will be from 2011 to 2016